Construction
Engineering
Installation
Manufacturing
Material Handling
Reinforcing
Safety Netting
Netting, Installation & Welding
The companies installation teams are the front line in creating customer relationships and demonstrating professionalism.
Composite Floor Decks have invested heavily in training and equipping its installation staff.
Today these self-sufficient installation teams are the backbone of Composite Floor Decks.
Studwelding
* All Installation, welding and netting teams are directly employed and are fully trained holding the following certificates:-
Gold Card / Site Safe Passport Holders
15757 Working at heights
* All site staff are provided with:
Adequate gloves and protective clothing
Safety boots
Eye protection conforming to the specification in BS 2092:1987
Ear defenders, hard hats and high visibility clothing
* Full safety arrest systems in the form of safety netting are designed and erected by Composite Floor Decks Limited
Studwelding
'One stop shop' for stud welding products and equipment
* A stock of the standard range of stud welding products is maintained
* Non-standard items can be manufactured to customer requirements & imported
* High performance Compact Stud Welding equipment is
available either from stock or on short delivery
* Training operatives, including certification, can be
combined with the supply of equipment
HiBond
- From our Shallow Composite Profile Range
HiBond is a composite steel flooring system that has been successfully used in a wide variety of commercial and residential applications for over thirty years, and is a proven performer in the three key areas of strength, reliability and economy.
HiBond is a versatile, lightweight system that delivers rapid and cost-effective installation saving on construction time.