25th August 2013 Not satisfied! First they measured for the quote 20sqm too much and then they didn't finished everything. They left several spots where lamps are installed and spots which were wet after a leak in the roof. That's OK, but they charged them and didn't gave me at least the material to finish it on my own.
Also a few other items - satisfied costumer seem not to be their first priority
P.S. ... and after insulation I don't really feel a difference...
Not satisfied! First they measured for the quote 20sqm too much and then they didn't finished everything. They left several spots where lamps are installed and spots which were wet after a leak in the roof. That's OK, but they charged them and didn't gave me at least the material to finish it on my own. Also a few other items - satisfied costumer seem not to be their first priority P.S. ... and after insulation I don't really feel a difference...